Feb 7, 2023The MillINTO THE VALLEY(S)One other job that we had to do is as a result of a rather sorry tale. The expensive Accoya windows we installed in the mill in December...
Dec 17, 2022The MillTHE ROOF IS TAKING SHAPENow we were into the fiddly timber work on the roof in terms of the valleys and framing round the mill itself. The valley bearers were to...
Oct 28, 2022The MillA HOUSE STARTS TO EMERGEThe timber frames on the intersecting portion of the building that links the mill to the new build were added next. The roof on this...
Oct 9, 2022The MillWORK ON THE TIMBER FRAME BEGINSWhen the posi-joists were installed for the first floor the landing was left out as this is a much shorter span side to side (3.6m) which...
Sep 20, 2022The MillGEARING UP FOR THE TIMBER FRAMEWith the posi-joists in place they were infilled with concrete block on the inside skin and a course of block was laid around the outside...