top of page
THE OLD MILL



INTO THE VALLEY(S)
One other job that we had to do is as a result of a rather sorry tale. The expensive Accoya windows we installed in the mill in December...
Feb 7, 2023
52 views


THE ROOF IS TAKING SHAPE
Now we were into the fiddly timber work on the roof in terms of the valleys and framing round the mill itself. The valley bearers were to...
Dec 17, 2022
57 views


A HOUSE STARTS TO EMERGE
The timber frames on the intersecting portion of the building that links the mill to the new build were added next. The roof on this...
Oct 29, 2022
42 views


WORK ON THE TIMBER FRAME BEGINS
When the posi-joists were installed for the first floor the landing was left out as this is a much shorter span side to side (3.6m) which...
Oct 10, 2022
21 views


GEARING UP FOR THE TIMBER FRAME
With the posi-joists in place they were infilled with concrete block on the inside skin and a course of block was laid around the outside...
Sep 21, 2022
15 views
bottom of page