Jul 6, 2021The GarageREPLACING THE FLOOR COVERINGThe decision had been taken to try and solve the water pressure issues for the barn and the cottage by installing a Mainsboost system...
Nov 30, 2018The GarageTHE STAIRCASE, ELECTRICS AND FLOOR COVERINGAccess to the mezzanine floor was to be provided via a centrally located staircase that would still allow a car to be stored in one side...
Aug 28, 2018The GarageTHE SLATES GO ON & INTERIOR WORKSNow the timber work was complete the slates could go on. The first job was to work out the overlap and spacing of the slates (these were...
Jun 20, 2018The GarageTHE REBUILDING STARTSWith the roof now completely off the old ‘barn doors’ were removed and widening of the door aperture to a more usable dimension (as well...
May 10, 2018The GarageTHE VERY FIRST TASK, WORK BEGINSThe first job to tackle at our newly acquired abode was that of the garage. This was chosen as the initial project partly as a secure...